Marlow, Buckinghamshire
Glazed rear extension in Marlow
We plan and build glazed and glass-box rear extensions for homeowners in Marlow. Full-height glass, slim frames and big rooflights for the most open rear room. Start with a free site visit, then a written price once the design is agreed.
Marlow and its postcode districts SL7 are part of our Buckinghamshire coverage. If your garden in Marlow faces south, expect us to talk about overhangs and solar-control glass before frame colours.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a glazed rear extension cost in Marlow?
Guide prices for a glazed rear extension in Marlow start from our South East England rate of £3,140–£5,380 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £37,500–£64,500 |
| 4 m wide × 6 m deep (24 m²) | £75,500–£129,000 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a glazed rear extension in Marlow?
The planning route for a glazed rear extension in Marlow is set by England's householder rules and your council.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Marlow like to extend?
Commuter semis and detached houses make up much of Marlow, and longer gardens make England's prior approval route for deeper rear extensions worth considering.
How a glazed rear extension in Marlow comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Glazed rear extensions near Marlow
From Marlow, the nearest places we also cover are Maidenhead (4.0 miles) and High Wycombe (4.3 miles).
- Glazed rear extension in Maidenhead
- Glazed rear extension in High Wycombe
- Glazed rear extension in Burnham
- Glazed rear extension in Henley-on-Thames
- Glazed rear extension in Beaconsfield
Other work in Marlow:
FAQ
Glazed rear extension questions in Marlow
How long does a rear extension take to build in Marlow?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can you match the brick or stone on my Marlow house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Does glass need planning permission?
The same rules apply as any rear extension; glass does not change the depth or height limits.
Do you handle building control in Marlow?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.