Newburn, Tyne and Wear
Single-storey rear extension in Newburn
For homes in Newburn, a single-storey rear extension is often the simplest way to gain space without moving. Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We take it from survey to completion certificate.
Newburn sits in Tyne and Wear, with postcode districts including NE5 and NE15. A single-storey rear extension in Newburn is mostly built from the garden side, so the house stays usable for most of the job.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a single-storey rear extension cost in Newburn?
For Newburn we work from the North East England rate: £1,710–£2,790 per square metre of new floor, including VAT, standard specification. North East prices are among the lowest in our range; former mining ground is the main foundation variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £20,500–£33,500 |
| 4 m wide × 5 m deep (20 m²) | £34,000–£56,000 |
| 4 m wide × 6 m deep (24 m²) | £41,000–£67,000 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a single-storey rear extension in Newburn?
Here is how the rules in England apply to a single-storey rear extension in Newburn.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Newburn like to extend?
Brick terraces, colliery houses and post-war semis make up much of Newburn. Former mining areas often need a coal mining risk check before foundations are designed.
How a single-storey rear extension in Newburn comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Single-storey rear extensions near Newburn
From Newburn, the nearest places we also cover are Blaydon-on-Tyne (2.0 miles) and Darras Hall (3.4 miles).
- Single-storey rear extension in Blaydon-on-Tyne
- Single-storey rear extension in Darras Hall
- Single-storey rear extension in Whickham
- Single-storey rear extension in Ponteland
- Single-storey rear extension in Prudhoe
Other work in Newburn:
FAQ
Single-storey rear extension questions in Newburn
Can you match the brick or stone on my Newburn house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
How long does a rear extension take to build in Newburn?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
How deep can a single-storey rear extension be without planning?
In England, 3 metres on an attached house and 4 metres on a detached house under permitted development, or up to 6 and 8 metres with prior approval. Wales allows 4 metres; Scotland and Northern Ireland have their own limits.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.