Didsbury, Greater Manchester
Single-storey rear extension in Didsbury
Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We design, get the approvals for and build single-storey rear extensions in Didsbury and the surrounding area, with one contract from the first survey to building control sign-off.
Didsbury is covered from our Greater Manchester round, including M14, M19 and M20. On terraced streets and 1930s semis like those around Didsbury, a single-storey rear extension is usually the simplest way to fix a small back kitchen without touching the bedrooms.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a single-storey rear extension cost in Didsbury?
In Didsbury, our guide for a single-storey rear extension is £1,790–£2,910 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,500–£35,000 |
| 4 m wide × 5 m deep (20 m²) | £35,500–£58,500 |
| 4 m wide × 6 m deep (24 m²) | £43,000–£70,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a single-storey rear extension in Didsbury?
The planning route for a single-storey rear extension in Didsbury is set by England's householder rules and your council.
English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.
England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Didsbury like to extend?
Didsbury has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.
How a single-storey rear extension in Didsbury comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Single-storey rear extensions near Didsbury
Close by, we work in Burnage, about 1.7 miles away, and Fallowfield, about 1.7 miles away.
- Single-storey rear extension in Burnage
- Single-storey rear extension in Fallowfield
- Single-storey rear extension in Stockport
- Single-storey rear extension in Longsight
- Single-storey rear extension in Cheadle Hulme
Other work in Didsbury:
FAQ
Single-storey rear extension questions in Didsbury
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
How long does a rear extension take to build in Didsbury?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need a structural engineer?
Yes for the beam over the new opening and usually for the foundations. Their calculations go to building control with the drawings.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.