Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Nuneaton, Warwickshire

Side return extension in Nuneaton

Side return extension in Nuneaton: infilling the narrow passage beside a Victorian or Edwardian back addition. We measure the house, show you what the rules allow, price it in writing and build it.

Nuneaton and its postcode districts CV10 and CV11 are part of our Warwickshire coverage. Side return projects in Nuneaton usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Nuneaton?

Guide prices for a side return extension in Nuneaton start from our West Midlands rate of £2,300–£3,800 per square metre, including VAT. The West Midlands is the baseline for our guide prices.

Side return extension prices in Nuneaton
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,500–£45,500
2.5 m wide × 7 m deep (17.5 m²)£40,500–£66,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Nuneaton?

The planning route for a side return extension in Nuneaton is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Nuneaton like to extend?

Nuneaton has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a side return extension in Nuneaton comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Nuneaton

Neighbouring places we cover include Hartshill (3.0 miles) and Bedworth (3.1 miles).

Other work in Nuneaton:

All rear extensions in Nuneaton

FAQ

Side return extension questions in Nuneaton

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can you match the brick or stone on my Nuneaton house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

Is the site visit in Nuneaton free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do you handle building control in Nuneaton?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in Nuneaton?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price