Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Banstead, Surrey

Side return extension in Banstead

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Banstead and the surrounding area, with one contract from the first survey to building control sign-off.

Banstead sits in Surrey, with postcode districts including KT17, KT18 and SM7. Side return projects in Banstead usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Banstead?

A side return extension in Banstead is priced at £2,580–£4,260 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Side return extension prices in Banstead
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£31,000–£51,000
2.5 m wide × 7 m deep (17.5 m²)£45,000–£74,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Banstead?

Here is how the rules in England apply to a side return extension in Banstead.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Banstead like to extend?

Commuter semis and detached houses make up much of Banstead, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a side return extension in Banstead comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Banstead

From Banstead, the nearest places we also cover are Belmont (1.5 miles) and Sutton (1.9 miles).

Other work in Banstead:

All rear extensions in Banstead

FAQ

Side return extension questions in Banstead

What postcode areas do you cover around Banstead?

Including KT17, KT18 and SM7, and the surrounding Surrey area.

Can you match the brick or stone on my Banstead house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Is a side return permitted development?

Sometimes, as a side extension within the width and height limits, but not in conservation areas, and many terraces are in one.

How long does a rear extension take to build in Banstead?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price