Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Banstead, Surrey

Glazed rear extension in Banstead

Thinking about a glazed rear extension in Banstead? Full-height glass, slim frames and big rooflights for the most open rear room. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Banstead is covered from our Surrey round, including KT17, KT18 and SM7. If your garden in Banstead faces south, expect us to talk about overhangs and solar-control glass before frame colours.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Banstead?

For Banstead we work from the South East England rate: £3,140–£5,380 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Banstead
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a glazed rear extension in Banstead?

The planning route for a glazed rear extension in Banstead is set by England's householder rules and your council.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Banstead like to extend?

Commuter semis and detached houses make up much of Banstead, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a glazed rear extension in Banstead comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Glazed rear extensions near Banstead

From Banstead, the nearest places we also cover are Belmont (1.5 miles) and Sutton (1.9 miles).

Other work in Banstead:

All rear extensions in Banstead

FAQ

Glazed rear extension questions in Banstead

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Is a glass box a conservatory?

No. It is built to Building Regulations as part of the house, with insulated floor and roof, so it is usable all year.

How long does a rear extension take to build in Banstead?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Is the site visit in Banstead free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price