Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Leek, Staffordshire

Side return extension in Leek

Infilling the narrow passage beside a Victorian or Edwardian back addition. If you live in Leek and want to know what a side return extension would cost and whether it needs planning, start with the online guide price or a free site visit.

We cover Leek (ST13) as part of our Staffordshire work. In Leek we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Leek?

A side return extension in Leek is priced at £2,300–£3,800 per square metre including VAT as a guide, before kitchen fit-out and fees. The West Midlands is the baseline for our guide prices.

Side return extension prices in Leek
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,500–£45,500
2.5 m wide × 7 m deep (17.5 m²)£40,500–£66,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Leek?

Planning for a side return extension in Leek follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Leek like to extend?

Leek has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a side return extension in Leek comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Leek

From Leek, the nearest places we also cover are Biddulph (6.4 miles) and Cheadle (8.5 miles).

Other work in Leek:

All rear extensions in Leek

FAQ

Side return extension questions in Leek

Do you handle building control in Leek?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Is the site visit in Leek free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Glass roof or solid roof with rooflights?

A glass roof gives the most light; a solid roof with long rooflights is warmer and quieter in rain. Both work.

What postcode areas do you cover around Leek?

Including ST13, and the surrounding Staffordshire area.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Leek?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price