Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Spalding, Lincolnshire

Side return extension in Spalding

Thinking about a side return extension in Spalding? Infilling the narrow passage beside a Victorian or Edwardian back addition. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Spalding sits in Lincolnshire, with postcode districts including PE11. Side returns suit the Victorian and Edwardian terraces found across parts of Lincolnshire, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Spalding?

For Spalding we work from the East Midlands rate: £2,230–£3,690 per square metre of new floor, including VAT, standard specification. East Midlands prices sit a little below our West Midlands baseline.

Side return extension prices in Spalding
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,000–£44,000
2.5 m wide × 7 m deep (17.5 m²)£39,000–£64,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Spalding?

Here is how the rules in England apply to a side return extension in Spalding.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Spalding like to extend?

Red-brick terraces and semis are typical of Spalding. Coal-mining legacy areas in parts of the East Midlands can need a Coal Authority check before foundations are designed.

How a side return extension in Spalding comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Spalding

We also build side return extensions in nearby Bourne (9.8 miles) and Market Deeping (10.3 miles).

Other work in Spalding:

All rear extensions in Spalding

FAQ

Side return extension questions in Spalding

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How much does a side return extension cost in Spalding?

As a guide, £2,230–£3,690 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £27,000–£44,000 at that rate. Your written price follows the survey.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

How long does a rear extension take to build in Spalding?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

What postcode areas do you cover around Spalding?

Including PE11, and the surrounding Lincolnshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price