Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cranford, Greater London

Side return extension in Cranford

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Cranford and the surrounding area, with one contract from the first survey to building control sign-off.

We cover Cranford (TW4, TW5 and TW6) as part of our Greater London work. In Cranford we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Cranford?

Guide prices for a side return extension in Cranford start from our London rate of £2,990–£4,940 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Side return extension prices in Cranford
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£36,000–£59,500
2.5 m wide × 7 m deep (17.5 m²)£52,500–£86,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Cranford?

Planning for a side return extension in Cranford follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Cranford like to extend?

Cranford is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.

How a side return extension in Cranford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Cranford

We also build side return extensions in nearby Heston (1.7 miles) and Feltham (2.1 miles).

Other work in Cranford:

All rear extensions in Cranford

FAQ

Side return extension questions in Cranford

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Do you handle building control in Cranford?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Can I combine a side return with a rear extension?

Yes; that is a wraparound extension, and it gives the biggest open-plan room a terrace can have.

Is the site visit in Cranford free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How long does a rear extension take to build in Cranford?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price