Cranford, Greater London
Two-storey rear extension in Cranford
A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. If you live in Cranford and want to know what a two-storey rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Cranford is covered from our Greater London round, including TW4, TW5 and TW6. In Greater London we check the neighbours' rear windows first, because the upper floor is where most two-storey schemes win or lose planning.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a two-storey rear extension cost in Cranford?
A two-storey rear extension in Cranford is priced at £2,340–£3,510 per square metre including VAT as a guide, before kitchen fit-out and fees. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.
| Size | Guide price inc VAT |
|---|---|
| 3 m × 5 m footprint, two floors (30 m²) | £70,000–£105,500 |
| 4 m × 6 m footprint, two floors (48 m²) | £112,500–£168,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a two-storey rear extension in Cranford?
The planning route for a two-storey rear extension in Cranford is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Cranford like to extend?
Cranford is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a two-storey rear extension in Cranford comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Two-storey rear extensions near Cranford
We also build two-storey rear extensions in nearby Heston (1.7 miles) and Feltham (2.1 miles).
- Two-storey rear extension in Heston
- Two-storey rear extension in Feltham
- Two-storey rear extension in Hounslow
- Two-storey rear extension in Osterley
- Two-storey rear extension in Hayes
Other work in Cranford:
FAQ
Two-storey rear extension questions in Cranford
Can you match the brick or stone on my Cranford house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Is the site visit in Cranford free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Can it be built on a terraced house?
Sometimes, but the upper floor is harder to get through planning on a terrace because of the effect on neighbours. A single-storey extension with a loft conversion is often an easier route.
How long does a rear extension take to build in Cranford?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.