Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Coulsdon, Greater London

Side return extension in Coulsdon

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in Coulsdon and the surrounding area, with one contract from the first survey to building control sign-off.

We cover Coulsdon (CR5, CR8 and SM6) as part of our Greater London work. Side return projects in Coulsdon usually start with a drainage survey of the side passage.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Coulsdon?

In Coulsdon, our guide for a side return extension is £2,990–£4,940 per square metre including VAT for a standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Side return extension prices in Coulsdon
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£36,000–£59,500
2.5 m wide × 7 m deep (17.5 m²)£52,500–£86,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a side return extension in Coulsdon?

Planning for a side return extension in Coulsdon follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Coulsdon like to extend?

Coulsdon is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.

How a side return extension in Coulsdon comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near Coulsdon

From Coulsdon, the nearest places we also cover are Purley (1.7 miles) and Kenley (1.8 miles).

Other work in Coulsdon:

All rear extensions in Coulsdon

FAQ

Side return extension questions in Coulsdon

Do you handle building control in Coulsdon?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Is the site visit in Coulsdon free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do I need my neighbour's permission?

Not their permission, but in England and Wales you must serve party wall notices, and a neighbour can consent in writing or ask for a surveyor's award.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

How long does a rear extension take to build in Coulsdon?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

How much does a side return extension cost in Coulsdon?

As a guide, £2,990–£4,940 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £36,000–£59,500 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price