For homes in Kirkintilloch, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.
Kirkintilloch sits in Glasgow and the Clyde, with postcode districts including G66. Side return projects in Kirkintilloch usually start with a drainage survey of the side passage.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a side return extension cost in Kirkintilloch?
For Kirkintilloch we work from the Scotland rate: £2,180–£3,610 per square metre of new floor, including VAT, standard specification. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.
| Size | Guide price inc VAT |
|---|---|
| 2 m wide × 6 m deep (12 m²) | £26,000–£43,500 |
| 2.5 m wide × 7 m deep (17.5 m²) | £38,000–£63,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a side return extension in Kirkintilloch?
The planning route for a side return extension in Kirkintilloch is set by Scotland's householder rules and your council.
Scottish householder rights treat the side part of a wraparound or side infill more strictly than a plain rear extension, so most need planning permission, and all need a building warrant.
There is no Party Wall Act in Scotland; neighbour matters are handled through the title deeds, common law and written agreement before work starts.
Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development or a planning application, plus the building warrant.
What are homes in Kirkintilloch like to extend?
Kirkintilloch has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.
How a side return extension in Kirkintilloch comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning or permitted development, the building warrant, structural design and neighbour agreements are all handled by us.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the accepted completion certificate and any guarantees from suppliers.
Side return extensions near Kirkintilloch
We also build side return extensions in nearby Bishopbriggs (3.4 miles) and Cumbernauld (6.3 miles).
- Side return extension in Bishopbriggs
- Side return extension in Cumbernauld
- Side return extension in Glasgow
- Side return extension in Milngavie
- Side return extension in Bearsden
Other work in Kirkintilloch:
FAQ
Side return extension questions in Kirkintilloch
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Do I need a party wall agreement?
Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.
Glass roof or solid roof with rooflights?
A glass roof gives the most light; a solid roof with long rooflights is warmer and quieter in rain. Both work.
How long does a rear extension take to build in Kirkintilloch?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need planning permission for a rear extension in Kirkintilloch?
Many single-storey rear extensions are permitted development under Class 1A, but not in conservation areas; you always need a building warrant before work starts.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.