Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Stanford-le-Hope, Essex

Side return extension in Stanford-le-Hope

Thinking about a side return extension in Stanford-le-Hope? Infilling the narrow passage beside a Victorian or Edwardian back addition. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

We cover Stanford-le-Hope (SS17) as part of our Essex work. In Stanford-le-Hope we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Stanford-le-Hope?

In Stanford-le-Hope, our guide for a side return extension is £2,440–£4,030 per square metre including VAT for a standard specification. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Side return extension prices in Stanford-le-Hope
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£29,500–£48,500
2.5 m wide × 7 m deep (17.5 m²)£42,500–£70,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Stanford-le-Hope?

The planning route for a side return extension in Stanford-le-Hope is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Stanford-le-Hope like to extend?

Post-war semis and newer estates are typical of Stanford-le-Hope, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a side return extension in Stanford-le-Hope comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Stanford-le-Hope

Neighbouring places we cover include Basildon (3.3 miles) and Pitsea (4.3 miles).

Other work in Stanford-le-Hope:

All rear extensions in Stanford-le-Hope

FAQ

Side return extension questions in Stanford-le-Hope

What postcode areas do you cover around Stanford-le-Hope?

Including SS17, and the surrounding Essex area.

Do you handle building control in Stanford-le-Hope?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

Can you match the brick or stone on my Stanford-le-Hope house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Stanford-le-Hope?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

How much does a side return extension cost in Stanford-le-Hope?

As a guide, £2,440–£4,030 per square metre including VAT for a standard specification. For example, 2 m wide × 6 m deep (12 m²): about £29,500–£48,500 at that rate. Your written price follows the survey.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price