Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Havant, Hampshire

Semi-detached rear extension in Havant

Semi-detached rear extension in Havant: single or two-storey extensions for semi-detached houses, with side access and one party wall. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Havant (PO9) as part of our Hampshire work. Semi-detached houses are common across Hampshire, and their side access makes rear extensions quicker to build.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Havant?

For Havant we work from the South East England rate: £2,130–£3,470 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Semi-detached rear extension prices in Havant
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a semi-detached rear extension in Havant?

The planning route for a semi-detached rear extension in Havant is set by England's householder rules and your council.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Havant like to extend?

Around Havant the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a semi-detached rear extension in Havant comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Semi-detached rear extensions near Havant

We also build rear extensions for semi-detached houses in nearby Emsworth (2.2 miles) and Waterlooville (2.6 miles).

Other work in Havant:

All rear extensions in Havant

FAQ

Semi-detached rear extension questions in Havant

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

How long does a rear extension take to build in Havant?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Single or two-storey on a semi?

Two-storey if you need bedrooms, single-storey if you need a bigger kitchen. Planning risk is lower for single-storey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need planning permission for a rear extension in Havant?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

What postcode areas do you cover around Havant?

Including PO9, and the surrounding Hampshire area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price