Havant, Hampshire
Two-storey rear extension in Havant
A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. If you live in Havant and want to know what a two-storey rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Havant and its postcode districts PO9 are part of our Hampshire coverage. Two-storey rear extensions suit semi-detached houses in Havant best, where the extra bedroom matters as much as the bigger kitchen.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a two-storey rear extension cost in Havant?
In Havant, our guide for a two-storey rear extension is £2,020–£3,020 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m × 5 m footprint, two floors (30 m²) | £60,500–£90,500 |
| 4 m × 6 m footprint, two floors (48 m²) | £97,000–£145,000 |
Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a two-storey rear extension in Havant?
Here is how the rules in England apply to a two-storey rear extension in Havant.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Havant like to extend?
Around Havant the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.
How a two-storey rear extension in Havant comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Two-storey rear extensions near Havant
Neighbouring places we cover include Emsworth (2.2 miles) and Waterlooville (2.6 miles).
- Two-storey rear extension in Emsworth
- Two-storey rear extension in Waterlooville
- Two-storey rear extension in Cosham
- Two-storey rear extension in South Hayling
- Two-storey rear extension in Hayling Island
Other work in Havant:
FAQ
Two-storey rear extension questions in Havant
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Will we need to move out?
Rarely. The first-floor opening is made late in the job and sealed with temporary screens.
How much does a two-storey rear extension cost in Havant?
As a guide, £2,020–£3,020 per square metre including VAT for a standard specification. For example, 3 m × 5 m footprint, two floors (30 m²): about £60,500–£90,500 at that rate. Your written price follows the survey.
How long does a rear extension take to build in Havant?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.