Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

East Sheen, Greater London

Semi-detached rear extension in East Sheen

We plan and build rear extensions for semi-detached houses for homeowners in East Sheen. Single or two-storey extensions for semi-detached houses, with side access and one party wall. Start with a free site visit, then a written price once the design is agreed.

We cover East Sheen (SW13, SW14 and TW9) as part of our Greater London work. Where an East Sheen semi already has a small lean-to at the back, we usually replace it rather than extend it.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in East Sheen?

Guide prices for a semi-detached rear extension in East Sheen start from our London rate of £2,470–£4,030 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Semi-detached rear extension prices in East Sheen
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£29,500–£48,500
4 m wide × 5 m deep (20 m²)£49,500–£80,500
4 m wide × 6 m deep (24 m²)£59,500–£96,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a semi-detached rear extension in East Sheen?

Whether your semi-detached rear extension in East Sheen needs a planning application depends on its size, your house and any local restrictions.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in East Sheen like to extend?

Period terraces in East Sheen sit alongside flats, and the difference matters: houses usually keep permitted development rights, while flats and maisonettes need planning permission for any rear extension.

How a semi-detached rear extension in East Sheen comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Semi-detached rear extensions near East Sheen

Neighbouring places we cover include Mortlake (0.5 miles) and Barnes (1.1 miles).

Other work in East Sheen:

All rear extensions in East Sheen

FAQ

Semi-detached rear extension questions in East Sheen

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need a party wall agreement?

Usually with the attached neighbour, in England and Wales.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can you match the brick or stone on my East Sheen house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need planning permission for a rear extension in East Sheen?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price