Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

East Sheen, Greater London

Side return extension in East Sheen

Infilling the narrow passage beside a Victorian or Edwardian back addition. We design, get the approvals for and build side return extensions in East Sheen and the surrounding area, with one contract from the first survey to building control sign-off.

East Sheen and its postcode districts SW13, SW14 and TW9 are part of our Greater London coverage. Side returns suit the Victorian and Edwardian terraces found across parts of Greater London, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in East Sheen?

Guide prices for a side return extension in East Sheen start from our London rate of £2,990–£4,940 per square metre, including VAT. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Side return extension prices in East Sheen
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£36,000–£59,500
2.5 m wide × 7 m deep (17.5 m²)£52,500–£86,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in East Sheen?

The planning route for a side return extension in East Sheen is set by England's householder rules and your council.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in East Sheen like to extend?

Much of East Sheen is Victorian and Edwardian terraced housing with narrow back additions, which suits side returns, wraparounds and 3 metre rear extensions. Many streets are in conservation areas, gardens are short, and almost everything comes through the house or along a rear alley.

How a side return extension in East Sheen comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Side return extensions near East Sheen

From East Sheen, the nearest places we also cover are Mortlake (0.5 miles) and Barnes (1.1 miles).

Other work in East Sheen:

All rear extensions in East Sheen

FAQ

Side return extension questions in East Sheen

Do you handle building control in East Sheen?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

How long does a rear extension take to build in East Sheen?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I combine a side return with a rear extension?

Yes; that is a wraparound extension, and it gives the biggest open-plan room a terrace can have.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Do I need planning permission for a rear extension in East Sheen?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price