Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Dundee, Dundee and Angus

Semi-detached rear extension in Dundee

Thinking about a semi-detached rear extension in Dundee? Single or two-storey extensions for semi-detached houses, with side access and one party wall. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Dundee sits in Dundee and Angus, with postcode districts including DD1, DD2, DD3 and DD4. Semi-detached houses are common across Dundee and Angus, and their side access makes rear extensions quicker to build.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Dundee?

A semi-detached rear extension in Dundee is priced at £1,800–£2,940 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Semi-detached rear extension prices in Dundee
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,500
4 m wide × 5 m deep (20 m²)£36,000–£59,000
4 m wide × 6 m deep (24 m²)£43,500–£70,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a semi-detached rear extension in Dundee?

Whether your semi-detached rear extension in Dundee needs a planning application depends on its size, your house and any local restrictions.

In Scotland a single-storey rear extension can be permitted development under Class 1A: eaves no higher than 3 metres and an overall height of 4 metres, and where any part is within 1 metre of a boundary it can project no more than 3 metres on a terraced house or 4 metres on other houses. The rights do not apply in conservation areas, and a building warrant is still needed before work starts.

In Scotland an extension of more than one storey is only permitted development (Class 1B) if no part is within 10 metres of any boundary and it is no higher than the existing house, so almost every two-storey rear extension needs planning permission and a building warrant.

Scotland has no larger-extension prior approval route; extensions beyond permitted development need a planning application.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development or a planning application, plus the building warrant.

What are homes in Dundee like to extend?

Dundee has sandstone tenements, terraced houses and villas closer in, with post-war semis and newer estates further out. Tenement and other flats need planning permission for an extension, and every project needs a building warrant before work starts.

How a semi-detached rear extension in Dundee comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning or permitted development, the building warrant, structural design and neighbour agreements are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the accepted completion certificate and any guarantees from suppliers.

Semi-detached rear extensions near Dundee

Neighbouring places we cover include Carnoustie (10.5 miles) and St Andrews (11.2 miles).

Other work in Dundee:

All rear extensions in Dundee

FAQ

Semi-detached rear extension questions in Dundee

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can I match pebbledash or render?

Yes. Many semis are refinished with new render across the whole back elevation so old and new match.

How long does a rear extension take to build in Dundee?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Is the site visit in Dundee free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price