Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Arbroath, Dundee and Angus

Semi-detached rear extension in Arbroath

Single or two-storey extensions for semi-detached houses, with side access and one party wall. We design, get the approvals for and build rear extensions for semi-detached houses in Arbroath and the surrounding area, with one contract from the first survey to building control sign-off.

Arbroath and its postcode districts DD11 are part of our Dundee and Angus coverage. Semi-detached houses are common across Dundee and Angus, and their side access makes rear extensions quicker to build.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a semi-detached rear extension cost in Arbroath?

Guide prices for a semi-detached rear extension in Arbroath start from our Scotland rate of £1,800–£2,940 per square metre, including VAT. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.

Semi-detached rear extension prices in Arbroath
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,500–£35,500
4 m wide × 5 m deep (20 m²)£36,000–£59,000
4 m wide × 6 m deep (24 m²)£43,500–£70,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a semi-detached rear extension in Arbroath?

The planning route for a semi-detached rear extension in Arbroath is set by Scotland's householder rules and your council.

Scottish householder permitted development (Class 1A) covers many single-storey rear extensions, with a 3 metre eaves limit, a 4 metre height limit and, within 1 metre of a boundary, a depth limit of 3 metres for terraced houses or 4 metres for others. Conservation areas are excluded, and you need a building warrant whatever the planning position.

Scottish Class 1B rights for extensions of more than one storey need a 10 metre gap to every boundary, which few gardens have. Expect a planning application as well as a building warrant for a double-storey rear extension.

Scotland has no larger-extension prior approval route; extensions beyond permitted development need a planning application.

Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development or a planning application, plus the building warrant.

What are homes in Arbroath like to extend?

Arbroath has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.

How a semi-detached rear extension in Arbroath comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check or planning application, then building warrant drawings and structural calculations, plus a written agreement with neighbours for any shared-wall work.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the accepted completion certificate and any guarantees from suppliers.

Semi-detached rear extensions near Arbroath

Neighbouring places we cover include Carnoustie (6.1 miles) and Montrose (11.6 miles).

Other work in Arbroath:

All rear extensions in Arbroath

FAQ

Semi-detached rear extension questions in Arbroath

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

What postcode areas do you cover around Arbroath?

Including DD11, and the surrounding Dundee and Angus area.

What if my neighbour has already extended?

That can make a matching depth easier to justify. We measure theirs at the survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Arbroath?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Arbroath?

Many single-storey rear extensions are permitted development under Class 1A, but not in conservation areas; you always need a building warrant before work starts.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price