Weybridge, Surrey
Rear extension planning drawings in Weybridge
Thinking about a rear extension in Weybridge? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
We cover Weybridge (KT13, KT15 and TW17) as part of our Surrey work. Planning applications in Weybridge go to the local planning authority covering Weybridge, and we check its local design guidance for rear extensions before drawing.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Weybridge?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a rear extension in Weybridge?
Here is how the rules in England apply to a rear extension in Weybridge.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Weybridge like to extend?
Around Weybridge the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.
How a rear extension in Weybridge comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Weybridge
From Weybridge, the nearest places we also cover are Addlestone (1.5 miles) and Shepperton (1.7 miles).
- Rear extension planning drawings in Addlestone
- Rear extension planning drawings in Shepperton
- Rear extension planning drawings in Walton-on-Thames
- Rear extension planning drawings in Chertsey
- Rear extension planning drawings in Sunbury-on-Thames
Other work in Weybridge:
FAQ
Rear extension planning drawings questions in Weybridge
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
How long does a rear extension take to build in Weybridge?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Are the drawings mine?
You can use them to get other quotes, subject to the terms.
What postcode areas do you cover around Weybridge?
Including KT13, KT15 and TW17, and the surrounding Surrey area.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.