Skegness, Lincolnshire
Rear extension planning drawings in Skegness
We plan and build rear extensions for homeowners in Skegness. Measured survey, design options, planning drawings and the application, handled for you. Start with a free site visit, then a written price once the design is agreed.
Skegness and its postcode districts PE25 are part of our Lincolnshire coverage. For Skegness homes we start with a measured survey, then draw options before anything is submitted.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Skegness?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Skegness?
Whether your rear extension in Skegness needs a planning application depends on its size, your house and any local restrictions.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Skegness like to extend?
Skegness has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.
How a rear extension in Skegness comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Rear extension planning drawings near Skegness
Neighbouring places we cover include Mablethorpe (14.0 miles) and Boston (19.0 miles).
- Rear extension planning drawings in Mablethorpe
- Rear extension planning drawings in Boston
- Rear extension planning drawings in Louth
- Rear extension planning drawings in King's Lynn
- Rear extension planning drawings in Spalding
Other work in Skegness:
FAQ
Rear extension planning drawings questions in Skegness
Do I need planning permission for a rear extension in Skegness?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
How long does a rear extension take to build in Skegness?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Can planning conditions affect the build?
Yes, for example matching materials or obscure glazing. We plan for them.
Is the site visit in Skegness free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do you handle building control in Skegness?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.