Havant, Hampshire
Rear extension planning drawings in Havant
Rear extension planning drawings in Havant: measured survey, design options, planning drawings and the application, handled for you. We measure the house, show you what the rules allow, price it in writing and build it.
Havant sits in Hampshire, with postcode districts including PO9. Rear extension applications in Hampshire are householder applications, which councils aim to decide within about eight weeks.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Havant?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a rear extension in Havant?
The planning route for a rear extension in Havant is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Havant like to extend?
Commuter semis and detached houses make up much of Havant, and longer gardens make England's prior approval route for deeper rear extensions worth considering.
How a rear extension in Havant comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Rear extension planning drawings near Havant
We also build rear extensions in nearby Emsworth (2.2 miles) and Waterlooville (2.6 miles).
- Rear extension planning drawings in Emsworth
- Rear extension planning drawings in Waterlooville
- Rear extension planning drawings in Cosham
- Rear extension planning drawings in South Hayling
- Rear extension planning drawings in Hayling Island
Other work in Havant:
FAQ
Rear extension planning drawings questions in Havant
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Do neighbours get consulted?
Yes for a full application: the council writes to them or puts up a site notice.
Can you match the brick or stone on my Havant house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Do you handle building control in Havant?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
How long does a rear extension take to build in Havant?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.