Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Uppermill, Greater Manchester

Rear extension planning drawings in Uppermill

Thinking about a rear extension in Uppermill? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Uppermill sits in Greater Manchester, with postcode districts including OL3 and OL4. Planning applications in Uppermill go to the local planning authority covering Uppermill, and we check its local design guidance for rear extensions before drawing.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

What do rear extension planning drawings cost in Uppermill?

As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a rear extension in Uppermill?

The planning route for a rear extension in Uppermill is set by England's householder rules and your council.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Uppermill like to extend?

Stone and brick terraces are common around Uppermill. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a rear extension in Uppermill comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Rear extension planning drawings near Uppermill

From Uppermill, the nearest places we also cover are Saddleworth (0.0 miles) and Lees (2.9 miles).

Other work in Uppermill:

All rear extensions in Uppermill

FAQ

Rear extension planning drawings questions in Uppermill

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can I see the design in 3D?

Yes; we produce simple 3D views so you can judge the size and light.

Is the site visit in Uppermill free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How long does a rear extension take to build in Uppermill?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Uppermill?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price