Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Uppermill, Greater Manchester

Wraparound extension in Uppermill

Wraparound extension in Uppermill: an L-shaped extension that fills the side return and runs across the back. We measure the house, show you what the rules allow, price it in writing and build it.

Uppermill and its postcode districts OL3 and OL4 are part of our Greater Manchester coverage. Wraparound projects around Uppermill often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Uppermill?

In Uppermill, our guide for a wraparound extension is £2,070–£3,380 per square metre including VAT for a standard specification. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Uppermill
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a wraparound extension in Uppermill?

Whether your wraparound extension in Uppermill needs a planning application depends on its size, your house and any local restrictions.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Uppermill like to extend?

Uppermill has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.

How a wraparound extension in Uppermill comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Uppermill

Close by, we work in Saddleworth, about 0.0 miles away, and Lees, about 2.9 miles away.

Other work in Uppermill:

All rear extensions in Uppermill

FAQ

Wraparound extension questions in Uppermill

What postcode areas do you cover around Uppermill?

Including OL3 and OL4, and the surrounding Greater Manchester area.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

Is the site visit in Uppermill free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

How long does a rear extension take to build in Uppermill?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price