What do rear extension planning drawings cost in Prestwich?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a rear extension in Prestwich?
The planning route for a rear extension in Prestwich is set by England's householder rules and your council.
A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Prestwich like to extend?
Stone and brick terraces are common around Prestwich. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.
How a rear extension in Prestwich comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Rear extension planning drawings near Prestwich
Neighbouring places we cover include Whitefield (1.3 miles) and Crumpsall (1.9 miles).
- Rear extension planning drawings in Whitefield
- Rear extension planning drawings in Crumpsall
- Rear extension planning drawings in Radcliffe
- Rear extension planning drawings in Cheetham Hill
- Rear extension planning drawings in Blackley
Other work in Prestwich:
FAQ
Rear extension planning drawings questions in Prestwich
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can you match the brick or stone on my Prestwich house?
We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.
Do I need an architect?
You need accurate drawings by someone who knows householder planning; we provide them.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Do I need planning permission for a rear extension in Prestwich?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
How long does a rear extension take to build in Prestwich?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.