Goodmayes, Greater London
Rear extension planning drawings in Goodmayes
Thinking about a rear extension in Goodmayes? Measured survey, design options, planning drawings and the application, handled for you. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Goodmayes is covered from our Greater London round, including IG3, RM6 and RM8. Planning applications in Goodmayes go to the local planning authority covering Goodmayes, and we check its local design guidance for rear extensions before drawing.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Goodmayes?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a rear extension in Goodmayes?
Whether your rear extension in Goodmayes needs a planning application depends on its size, your house and any local restrictions.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Goodmayes like to extend?
Goodmayes is mostly 1930s semis, short terraces and post-war houses, so full-width single-storey and two-storey rear extensions are realistic on many plots. Some later estates had permitted development rights removed by condition, so we check the planning history first.
How a rear extension in Goodmayes comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Design and guide price
Two or three layout options with a guide price for each, so you choose the design knowing what it costs.
Approvals
Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Rear extension planning drawings near Goodmayes
Close by, we work in Becontree, about 1.0 miles away, and Ilford, about 1.7 miles away.
- Rear extension planning drawings in Becontree
- Rear extension planning drawings in Ilford
- Rear extension planning drawings in Barkingside
- Rear extension planning drawings in Barking
- Rear extension planning drawings in Dagenham
Other work in Goodmayes:
FAQ
Rear extension planning drawings questions in Goodmayes
What do rear extension planning drawings cost in Goodmayes?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension and £2,000–£3,500 for a two-storey scheme, covering the measured survey, design options and the application. The council fee is extra.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can planning conditions affect the build?
Yes, for example matching materials or obscure glazing. We plan for them.
What postcode areas do you cover around Goodmayes?
Including IG3, RM6 and RM8, and the surrounding Greater London area.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Is the site visit in Goodmayes free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.