Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Goodmayes, Greater London

Single-storey rear extension in Goodmayes

Ground-floor space across the back of the house, usually for a kitchen, dining or family room. We design, get the approvals for and build single-storey rear extensions in Goodmayes and the surrounding area, with one contract from the first survey to building control sign-off.

Goodmayes sits in Greater London, with postcode districts including IG3, RM6 and RM8. A single-storey rear extension in Goodmayes is mostly built from the garden side, so the house stays usable for most of the job.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a single-storey rear extension cost in Goodmayes?

For Goodmayes we work from the London rate: £2,470–£4,030 per square metre of new floor, including VAT, standard specification. London prices sit at the top of our range because of labour rates, access through the house, parking suspensions and skip licences.

Single-storey rear extension prices in Goodmayes
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£29,500–£48,500
4 m wide × 5 m deep (20 m²)£49,500–£80,500
4 m wide × 6 m deep (24 m²)£59,500–£96,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a single-storey rear extension in Goodmayes?

The planning route for a single-storey rear extension in Goodmayes is set by England's householder rules and your council.

English permitted development (Class A) allows a single-storey rear extension of 3 metres on a terraced or semi-detached house and 4 metres on a detached one, measured from the original house, with a maximum height of 4 metres and eaves of no more than 3 metres within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Goodmayes like to extend?

Much of Goodmayes is 1920s and 1930s semis and short terraces with longer gardens than inner London, which suit full-width single-storey rear extensions. Parking suspensions, skip licences and controlled hours on residential streets shape the programme more than the build itself.

How a single-storey rear extension in Goodmayes comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Single-storey rear extensions near Goodmayes

Neighbouring places we cover include Becontree (1.0 miles) and Ilford (1.7 miles).

Other work in Goodmayes:

All rear extensions in Goodmayes

FAQ

Single-storey rear extension questions in Goodmayes

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How long does a rear extension take to build in Goodmayes?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I stay in the house during the build?

Usually yes. The noisiest, dustiest stage, removing the back wall, is kept to the final weeks and screened off. Most families set up a temporary kitchen elsewhere in the house.

Can you match the brick or stone on my Goodmayes house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How much does a single-storey rear extension cost in Goodmayes?

As a guide, £2,470–£4,030 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £29,500–£48,500 at that rate. Your written price follows the survey.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price