Tranent, Edinburgh and the Lothians
Rear extension planning drawings in Tranent
Measured survey, design options, planning drawings and the application, handled for you. If you live in Tranent and want to know what a rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Tranent sits in Edinburgh and the Lothians, with postcode districts including EH33. Planning applications in Tranent go to the local planning authority covering Tranent, and we check its local design guidance for rear extensions before drawing.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Tranent?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. Planning and building warrant fees in Scotland are set nationally and by value of work; we confirm both before submitting. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Tranent?
Whether your rear extension in Tranent needs a planning application depends on its size, your house and any local restrictions.
In Scotland an extension of more than one storey is only permitted development (Class 1B) if no part is within 10 metres of any boundary and it is no higher than the existing house, so almost every two-storey rear extension needs planning permission and a building warrant.
Scottish councils aim to decide householder applications within two months; the building warrant runs alongside.
Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Tranent like to extend?
Tranent has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.
How a rear extension in Tranent comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for the building warrant.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Rear extension planning drawings near Tranent
Neighbouring places we cover include Musselburgh (3.7 miles) and Dalkeith (5.7 miles).
- Rear extension planning drawings in Musselburgh
- Rear extension planning drawings in Dalkeith
- Rear extension planning drawings in Mayfield
- Rear extension planning drawings in Bonnyrigg
- Rear extension planning drawings in Edinburgh
Other work in Tranent:
FAQ
Rear extension planning drawings questions in Tranent
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.
Is the site visit in Tranent free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Are the drawings mine?
You can use them to get other quotes, subject to the terms.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
How long does a rear extension take to build in Tranent?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.