Derby, Derbyshire
Rear extension planning drawings in Derby
We plan and build rear extensions for homeowners in Derby. Measured survey, design options, planning drawings and the application, handled for you. Start with a free site visit, then a written price once the design is agreed.
Derby sits in Derbyshire, with postcode districts including DE1, DE3, DE21 and DE22. For Derby homes we start with a measured survey, then draw options before anything is submitted.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
What do rear extension planning drawings cost in Derby?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension, or £2,000–£3,500 for a two-storey scheme. A householder planning application in England costs £548 (£575 for applications made from 8 December 2026), and a lawful development certificate for proposed work costs half the householder fee. Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.
Do you need planning permission for a rear extension in Derby?
Planning for a rear extension in Derby follows the English householder rules.
England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.
Councils aim to decide householder applications within 8 weeks of validation, and prior approval within 42 days.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.
What are homes in Derby like to extend?
Derby has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.
How a rear extension in Derby comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Rear extension planning drawings near Derby
Neighbouring places we cover include Chaddesden (1.8 miles) and Oakwood (2.4 miles).
- Rear extension planning drawings in Chaddesden
- Rear extension planning drawings in Oakwood
- Rear extension planning drawings in Sinfin
- Rear extension planning drawings in Belper
- Rear extension planning drawings in Ilkeston
Other work in Derby:
FAQ
Rear extension planning drawings questions in Derby
Do you handle building control in Derby?
Yes. We apply to the council or a registered building control approver and hand over the completion certificate.
What postcode areas do you cover around Derby?
Including DE1, DE3, DE21, DE22, DE23 and DE24, and the surrounding Derbyshire area.
What if planning is refused?
We review the reasons with you, amend and resubmit (often free of a second fee within 12 months in England) or appeal.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
What do rear extension planning drawings cost in Derby?
As a guide, £1,000–£2,500 including VAT for a single-storey rear extension and £2,000–£3,500 for a two-storey scheme, covering the measured survey, design options and the application. The council fee is extra.
How long does a rear extension take to build in Derby?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.