Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Derby, Derbyshire

Side return extension in Derby

For homes in Derby, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.

Derby sits in Derbyshire, with postcode districts including DE1, DE3, DE21 and DE22. In Derby we check the boundary line and the neighbour's gutter before drawing a side return, because a few centimetres decide whether the wall goes on or beside the boundary.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Derby?

In Derby, our guide for a side return extension is £2,230–£3,690 per square metre including VAT for a standard specification. East Midlands prices sit a little below our West Midlands baseline.

Side return extension prices in Derby
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£27,000–£44,000
2.5 m wide × 7 m deep (17.5 m²)£39,000–£64,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a side return extension in Derby?

Here is how the rules in England apply to a side return extension in Derby.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Derby like to extend?

Derby has plenty of inter-war semis and bungalows, and single-storey rear extensions suit both.

How a side return extension in Derby comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Side return extensions near Derby

Neighbouring places we cover include Chaddesden (1.8 miles) and Oakwood (2.4 miles).

Other work in Derby:

All rear extensions in Derby

FAQ

Side return extension questions in Derby

Can you match the brick or stone on my Derby house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Derby?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Where does the drainage go?

Side passages often carry the soil and rainwater pipes. We survey them first and reroute them under the new floor where needed.

Do I need planning permission for a rear extension in Derby?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Is the site visit in Derby free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price