Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Abergavenny, Newport and Monmouthshire

Kitchen-diner rear extension in Abergavenny

Thinking about a kitchen-diner rear extension in Abergavenny? An open-plan kitchen, dining and family room that opens straight onto the garden. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Abergavenny sits in Newport and Monmouthshire, with postcode districts including NP7. A kitchen-diner is often the reason people in Abergavenny extend: the back kitchen in older terraces and post-war semis is rarely big enough for a table.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Abergavenny?

For Abergavenny we work from the Wales rate: £1,770–£2,880 per square metre of new floor, including VAT, standard specification. Prices in Wales sit below our West Midlands baseline; sloping sites are the main variable.

Kitchen-diner rear extension prices in Abergavenny
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,500
4 m wide × 5 m deep (20 m²)£35,500–£57,500
4 m wide × 6 m deep (24 m²)£42,500–£69,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a kitchen-diner rear extension in Abergavenny?

The planning route for a kitchen-diner rear extension in Abergavenny is set by Wales's householder rules and your council.

In Wales a single-storey rear extension can often be permitted development if it projects no more than 4 metres beyond the rear wall and is no more than 4 metres high. Wales has no prior approval route for deeper extensions, so anything bigger needs a householder planning application.

Conservation areas, National Parks and National Landscapes restrict permitted development in Wales, and listed buildings need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Abergavenny like to extend?

Older terraces near the centre and post-war semis further out are typical of Abergavenny. Sloping sites are common in Wales, so floor levels and retaining walls are designed at the start.

How a kitchen-diner rear extension in Abergavenny comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check or householder planning application, then Building Regulations drawings to the Welsh Approved Documents and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Kitchen-diner rear extensions near Abergavenny

From Abergavenny, the nearest places we also cover are Brynmawr (7.2 miles) and Abertillery (8.0 miles).

Other work in Abergavenny:

All rear extensions in Abergavenny

FAQ

Kitchen-diner rear extension questions in Abergavenny

Can you match the brick or stone on my Abergavenny house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Where does the cooker extraction go?

Through the new wall or roof, ducted to outside. Recirculating hoods are possible but less effective.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Do I need planning permission for a rear extension in Abergavenny?

Often not for a single-storey rear extension of up to 4 metres under Welsh permitted development. Wales has no prior approval route for deeper extensions.

How long does a rear extension take to build in Abergavenny?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price