Bellshill, Lanarkshire
Kitchen-diner rear extension in Bellshill
An open-plan kitchen, dining and family room that opens straight onto the garden. We design, get the approvals for and build kitchen-diner rear extensions in Bellshill and the surrounding area, with one contract from the first survey to building control sign-off.
We cover Bellshill (ML1, ML4 and ML5) as part of our Lanarkshire work. For Bellshill kitchens we plan the extraction route and the island drainage before the slab is poured, so nothing has to be chased in later.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a kitchen-diner rear extension cost in Bellshill?
A kitchen-diner rear extension in Bellshill is priced at £1,800–£2,940 per square metre including VAT as a guide, before kitchen fit-out and fees. Prices in Scotland sit a little below our West Midlands baseline; building warrant fees and drawings are budgeted separately.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £21,500–£35,500 |
| 4 m wide × 5 m deep (20 m²) | £36,000–£59,000 |
| 4 m wide × 6 m deep (24 m²) | £43,500–£70,500 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a kitchen-diner rear extension in Bellshill?
The planning route for a kitchen-diner rear extension in Bellshill is set by Scotland's householder rules and your council.
Scottish householder permitted development (Class 1A) covers many single-storey rear extensions, with a 3 metre eaves limit, a 4 metre height limit and, within 1 metre of a boundary, a depth limit of 3 metres for terraced houses or 4 metres for others. Conservation areas are excluded, and you need a building warrant whatever the planning position.
Scotland has no larger-extension prior approval route; extensions beyond permitted development need a planning application.
Classes 1A and 1B do not apply in conservation areas, and listed buildings need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in Bellshill like to extend?
Bellshill has sandstone villas and terraces, post-war semis and four-in-a-block flats. Flats need planning permission for an extension, and every project needs a building warrant before work starts.
How a kitchen-diner rear extension in Bellshill comes together
Survey visit
We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Approvals
Permitted development check or planning application, then building warrant drawings and structural calculations, plus a written agreement with neighbours for any shared-wall work.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the accepted completion certificate.
Kitchen-diner rear extensions near Bellshill
We also build kitchen-diner rear extensions in nearby Mossend (0.6 miles) and Viewpark (1.7 miles).
- Kitchen-diner rear extension in Mossend
- Kitchen-diner rear extension in Viewpark
- Kitchen-diner rear extension in Motherwell
- Kitchen-diner rear extension in Coatbridge
- Kitchen-diner rear extension in Blantyre
Other work in Bellshill:
FAQ
Kitchen-diner rear extension questions in Bellshill
Do I need a party wall agreement?
Scotland has no Party Wall Act; we agree access and protection with your neighbour in writing instead.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Where does the cooker extraction go?
Through the new wall or roof, ducted to outside. Recirculating hoods are possible but less effective.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Do you handle building control in Bellshill?
Yes. We apply for the building warrant before work starts and submit the completion certificate at the end.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.