Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Snodland, Kent

Kitchen-diner rear extension in Snodland

Kitchen-diner rear extension in Snodland: an open-plan kitchen, dining and family room that opens straight onto the garden. We measure the house, show you what the rules allow, price it in writing and build it.

We cover Snodland (ME6) as part of our Kent work. We usually keep the working kitchen where the old one was and put the dining table in the new space by the doors, which suits most Snodland homes.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a kitchen-diner rear extension cost in Snodland?

Guide prices for a kitchen-diner rear extension in Snodland start from our South East England rate of £2,130–£3,470 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Kitchen-diner rear extension prices in Snodland
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£25,500–£41,500
4 m wide × 5 m deep (20 m²)£42,500–£69,500
4 m wide × 6 m deep (24 m²)£51,000–£83,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a kitchen-diner rear extension in Snodland?

Here is how the rules in England apply to a kitchen-diner rear extension in Snodland.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Snodland like to extend?

Snodland has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a kitchen-diner rear extension in Snodland comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Kitchen-diner rear extensions near Snodland

We also build kitchen-diner rear extensions in nearby Strood (4.6 miles) and Rochester (4.8 miles).

Other work in Snodland:

All rear extensions in Snodland

FAQ

Kitchen-diner rear extension questions in Snodland

Is the site visit in Snodland free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Can I add a utility room?

Often. A narrow utility or boot room along one side keeps the washing machine out of the open-plan space.

Can you match the brick or stone on my Snodland house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price