Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cheadle, Staffordshire

Glazed rear extension in Cheadle

Glazed rear extension in Cheadle: full-height glass, slim frames and big rooflights for the most open rear room. We measure the house, show you what the rules allow, price it in writing and build it.

Cheadle and its postcode districts ST10 are part of our Staffordshire coverage. Glass-led rear extensions in Cheadle are planned around which way the garden faces, because that decides the glass specification.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Cheadle?

In Cheadle, our guide for a glazed rear extension is £2,800–£4,800 per square metre including VAT for a standard specification. The West Midlands is the baseline for our guide prices.

Glazed rear extension prices in Cheadle
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£33,500–£57,500
4 m wide × 6 m deep (24 m²)£67,000–£115,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a glazed rear extension in Cheadle?

Planning for a glazed rear extension in Cheadle follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.

What are homes in Cheadle like to extend?

Red-brick terraces and 1930s semis make up much of Cheadle. Many already have a small kitchen lean-to at the back, which a new rear extension usually replaces rather than adds to.

How a glazed rear extension in Cheadle comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Glazed rear extensions near Cheadle

Close by, we work in Longton, about 6.2 miles away, and Uttoxeter, about 7.7 miles away.

Other work in Cheadle:

All rear extensions in Cheadle

FAQ

Glazed rear extension questions in Cheadle

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Is there a limit on how much glass I can have?

In England the simple rule is 25% of the floor area plus openings removed; more is allowed with a calculation showing the house still meets Part L.

What postcode areas do you cover around Cheadle?

Including ST10, and the surrounding Staffordshire area.

How long does a rear extension take to build in Cheadle?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price