Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Hayling Island, Hampshire

Glazed rear extension in Hayling Island

For homes in Hayling Island, a glazed rear extension is often the simplest way to gain space without moving. Full-height glass, slim frames and big rooflights for the most open rear room. We take it from survey to completion certificate.

Hayling Island is covered from our Hampshire round, including PO11. Glass-led rear extensions in Hayling Island are planned around which way the garden faces, because that decides the glass specification.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a glazed rear extension cost in Hayling Island?

In Hayling Island, our guide for a glazed rear extension is £3,140–£5,380 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Glazed rear extension prices in Hayling Island
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£37,500–£64,500
4 m wide × 6 m deep (24 m²)£75,500–£129,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a glazed rear extension in Hayling Island?

Whether your glazed rear extension in Hayling Island needs a planning application depends on its size, your house and any local restrictions.

In England a single-storey rear extension can often be built under permitted development: up to 3 metres beyond the original rear wall of an attached house, or 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres if any part is within 2 metres of a boundary.

New fabric must meet Approved Document L (2021 edition incorporating 2023 amendments): walls 0.18, roof 0.15 and floor 0.18 W/m²K, windows 1.4 W/m²K or Band B. Under the simple route, new windows, doors and rooflights should not exceed 25% of the extension floor area plus any openings removed; more glass is possible with a whole-house calculation.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Hayling Island like to extend?

Around Hayling Island the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a glazed rear extension in Hayling Island comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Glazed rear extensions near Hayling Island

Neighbouring places we cover include South Hayling (0.5 miles) and Emsworth (4.6 miles).

Other work in Hayling Island:

All rear extensions in Hayling Island

FAQ

Glazed rear extension questions in Hayling Island

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Will a glass extension be too hot?

Not if it is designed for its orientation, with solar-control glass, shading and ventilation.

How long does a rear extension take to build in Hayling Island?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need planning permission for a rear extension in Hayling Island?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price