Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

West Molesey, Surrey

Two-storey rear extension in West Molesey

For homes in West Molesey, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.

West Molesey is covered from our Surrey round, including KT8, KT12 and KT13. In West Molesey, a two-storey rear extension is worth comparing with the cost of moving once stamp duty, agents' and legal fees are counted.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in West Molesey?

In West Molesey, our guide for a two-storey rear extension is £2,020–£3,020 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Two-storey rear extension prices in West Molesey
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£60,500–£90,500
4 m × 6 m footprint, two floors (48 m²)£97,000–£145,000

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a two-storey rear extension in West Molesey?

Whether your two-storey rear extension in West Molesey needs a planning application depends on its size, your house and any local restrictions.

England's rules allow a rear extension of more than one storey without an application only when it is no deeper than 3 metres and at least 7 metres from the boundary opposite the rear wall, and never on designated land. Most two-storey schemes need householder planning permission.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in West Molesey like to extend?

Commuter semis and detached houses make up much of West Molesey, and longer gardens make England's prior approval route for deeper rear extensions worth considering.

How a two-storey rear extension in West Molesey comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Two-storey rear extensions near West Molesey

From West Molesey, the nearest places we also cover are Hampton (1.1 miles) and East Molesey (1.3 miles).

Other work in West Molesey:

All rear extensions in West Molesey

FAQ

Two-storey rear extension questions in West Molesey

Do I need planning permission for a rear extension in West Molesey?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Is two-storey cheaper per square metre than single-storey?

Usually yes, because the foundations and roof are shared across twice the floor area. The total cost is higher.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

What postcode areas do you cover around West Molesey?

Including KT8, KT12 and KT13, and the surrounding Surrey area.

How long does a rear extension take to build in West Molesey?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price