Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Ascot, Berkshire

Two-storey rear extension in Ascot

For homes in Ascot, a two-storey rear extension is often the simplest way to gain space without moving. A larger kitchen downstairs and an extra bedroom or bathroom upstairs, under one roof. We take it from survey to completion certificate.

We cover Ascot (SL5) as part of our Berkshire work. Two-storey rear extensions suit semi-detached houses in Ascot best, where the extra bedroom matters as much as the bigger kitchen.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a two-storey rear extension cost in Ascot?

Guide prices for a two-storey rear extension in Ascot start from our South East England rate of £2,020–£3,020 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Two-storey rear extension prices in Ascot
SizeGuide price inc VAT
3 m × 5 m footprint, two floors (30 m²)£60,500–£90,500
4 m × 6 m footprint, two floors (48 m²)£97,000–£145,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a two-storey rear extension in Ascot?

Here is how the rules in England apply to a two-storey rear extension in Ascot.

A two-storey rear extension can be permitted development in England only if it projects no more than 3 metres, stays at least 7 metres from the rear boundary, matches the existing roof pitch and has obscure-glazed upper side windows. In practice most double-storey rear extensions go through a householder planning application.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Ascot like to extend?

Around Ascot the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a two-storey rear extension in Ascot comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Two-storey rear extensions near Ascot

From Ascot, the nearest places we also cover are Sunninghill (1.1 miles) and Bracknell (3.3 miles).

Other work in Ascot:

All rear extensions in Ascot

FAQ

Two-storey rear extension questions in Ascot

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can it be built on a terraced house?

Sometimes, but the upper floor is harder to get through planning on a terrace because of the effect on neighbours. A single-storey extension with a loft conversion is often an easier route.

Can you match the brick or stone on my Ascot house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Ascot?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price