Margate, Kent
Bungalow rear extension in Margate
Single-storey rear extensions that keep everything on one level. If you live in Margate and want to know what a bungalow rear extension would cost and whether it needs planning, start with the online guide price or a free site visit.
Margate and its postcode districts CT8, CT9 and CT11 are part of our Kent coverage. For bungalows in Kent, a rear extension is the usual way to add space without adding stairs.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a bungalow rear extension cost in Margate?
In Margate, our guide for a bungalow rear extension is £2,070–£3,360 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| 3 m wide × 4 m deep (12 m²) | £25,000–£40,500 |
| 4 m wide × 6 m deep (24 m²) | £49,500–£80,500 |
These are guide ranges; the written quote after the survey is the figure that counts.
Do you need planning permission for a bungalow rear extension in Margate?
Planning for a bungalow rear extension in Margate follows the English householder rules.
Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.
If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Margate like to extend?
Margate has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a bungalow rear extension in Margate comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Written price, then build
Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.
Bungalow rear extensions near Margate
Neighbouring places we cover include Broadstairs (2.9 miles) and Ramsgate (3.4 miles).
- Bungalow rear extension in Broadstairs
- Bungalow rear extension in Ramsgate
- Bungalow rear extension in Deal
- Bungalow rear extension in Herne Bay
- Bungalow rear extension in Canterbury
Other work in Margate:
FAQ
Bungalow rear extension questions in Margate
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Can I live at home while the extension is built?
Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.
Can a bungalow extension be fully accessible?
Yes: level thresholds, wider doors and a wet room are straightforward to design in.
Can I get a price without a visit?
Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
How long does a rear extension take to build in Margate?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.