Old Trafford, Greater Manchester

Bungalow rear extension in Old Trafford

For homes in Old Trafford, a bungalow rear extension is often the simplest way to gain space without moving. Single-storey rear extensions that keep everything on one level. We take it from survey to completion certificate.

We cover Old Trafford (M17, M32 and M33) as part of our Greater Manchester work. For Old Trafford bungalows we design the roof first, because the low eaves decide the height of the new room.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in Old Trafford?

Guide prices for a bungalow rear extension in Old Trafford start from our North West England rate of £1,740–£2,820 per square metre, including VAT. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Bungalow rear extension prices in Old Trafford
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£21,000–£34,000
4 m wide × 6 m deep (24 m²)£41,500–£67,500

Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.

Do you need planning permission for a bungalow rear extension in Old Trafford?

Planning for a bungalow rear extension in Old Trafford follows the English householder rules.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

If 3 or 4 metres is not enough, England's prior approval route allows 6 metres on a terraced or semi-detached house and 8 metres on a detached house for a single-storey rear extension. Neighbours are consulted, the council decides within 42 days, and the fee is £249, rising to £310 from 8 December 2026.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Old Trafford like to extend?

Stone and brick terraces are common around Old Trafford. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a bungalow rear extension in Old Trafford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Bungalow rear extensions near Old Trafford

Neighbouring places we cover include Stretford (1.3 miles) and Salford (2.1 miles).

Other work in Old Trafford:

All rear extensions in Old Trafford

FAQ

Bungalow rear extension questions in Old Trafford

How much does a bungalow rear extension cost in Old Trafford?

As a guide, £1,740–£2,820 per square metre including VAT for a standard specification. For example, 3 m wide × 4 m deep (12 m²): about £21,000–£34,000 at that rate. Your written price follows the survey.

Do I need planning permission for a rear extension in Old Trafford?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need to move out?

Rarely; the opening into the bungalow is made late in the build.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Is the site visit in Old Trafford free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.