Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Old Trafford, Greater Manchester

Side return extension in Old Trafford

For homes in Old Trafford, a side return extension is often the simplest way to gain space without moving. Infilling the narrow passage beside a Victorian or Edwardian back addition. We take it from survey to completion certificate.

Old Trafford is covered from our Greater Manchester round, including M17, M32 and M33. Side returns suit the Victorian and Edwardian terraces found across parts of Greater Manchester, where the kitchen sits in a narrow back addition.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a side return extension cost in Old Trafford?

A side return extension in Old Trafford is priced at £2,160–£3,570 per square metre including VAT as a guide, before kitchen fit-out and fees. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Side return extension prices in Old Trafford
SizeGuide price inc VAT
2 m wide × 6 m deep (12 m²)£26,000–£43,000
2.5 m wide × 7 m deep (17.5 m²)£38,000–£62,500

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a side return extension in Old Trafford?

Whether your side return extension in Old Trafford needs a planning application depends on its size, your house and any local restrictions.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Old Trafford like to extend?

Stone and brick terraces are common around Old Trafford. Where houses back onto a ginnel or alley, deliveries can come in from the rear, which makes the build tidier.

How a side return extension in Old Trafford comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Side return extensions near Old Trafford

Neighbouring places we cover include Stretford (1.3 miles) and Salford (2.1 miles).

Other work in Old Trafford:

All rear extensions in Old Trafford

FAQ

Side return extension questions in Old Trafford

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

How much space does a side return add?

Typically 8 to 18 square metres, enough to turn a galley kitchen into a kitchen-diner with an island.

Do I need planning permission for a rear extension in Old Trafford?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price