Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

March, Cambridgeshire

Bungalow rear extension in March

We plan and build rear extensions for bungalows for homeowners in March. Single-storey rear extensions that keep everything on one level. Start with a free site visit, then a written price once the design is agreed.

March sits in Cambridgeshire, with postcode districts including PE15. For bungalows in Cambridgeshire, a rear extension is the usual way to add space without adding stairs.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a bungalow rear extension cost in March?

A bungalow rear extension in March is priced at £1,960–£3,180 per square metre including VAT as a guide, before kitchen fit-out and fees. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Bungalow rear extension prices in March
SizeGuide price inc VAT
3 m wide × 4 m deep (12 m²)£23,500–£38,000
4 m wide × 6 m deep (24 m²)£47,000–£76,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a bungalow rear extension in March?

Here is how the rules in England apply to a bungalow rear extension in March.

Under England's householder permitted development rules you can usually add 3 metres at the back of an attached house, or 4 metres on a detached house, without a planning application, as long as the extension stays under 4 metres high and its eaves stay under 3 metres where it is within 2 metres of a boundary.

England also has the larger home extension route: a single-storey rear extension of up to 6 metres on an attached house or 8 metres on a detached house, after prior approval from the council. The council notifies your neighbours and has 42 days to decide; the fee is £249 (£310 for applications made from 8 December 2026). The route is not available on designated land such as conservation areas.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in March like to extend?

Post-war semis and newer estates are typical of March, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a bungalow rear extension in March comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Fixed price and build

    A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.

Bungalow rear extensions near March

Neighbouring places we cover include Chatteris (6.7 miles) and Primrose Place (8.3 miles).

Other work in March:

All rear extensions in March

FAQ

Bungalow rear extension questions in March

Can you match the brick or stone on my March house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Will the roof look odd?

Not if the pitch and tiles match. Where the eaves are low, a flat-roofed section with a lantern is an alternative.

Do I need planning permission for a rear extension in March?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Is the site visit in March free?

Yes. We visit, measure up and talk through the options with no cost and no obligation.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price