Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Castle Vale, West Midlands

Wraparound extension in Castle Vale

An L-shaped extension that fills the side return and runs across the back. If you live in Castle Vale and want to know what a wraparound extension would cost and whether it needs planning, start with the online guide price or a free site visit.

Castle Vale is covered from our West Midlands round, including B24, B34 and B35. Wraparound projects around Castle Vale often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Castle Vale?

In Castle Vale, our guide for a wraparound extension is £2,200–£3,600 per square metre including VAT for a standard specification. The West Midlands is the baseline for our guide prices.

Wraparound extension prices in Castle Vale
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£48,500–£79,000
L-shaped, about 30 m² of new floor£66,000–£108,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a wraparound extension in Castle Vale?

The planning route for a wraparound extension in Castle Vale is set by England's householder rules and your council.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Castle Vale like to extend?

Castle Vale has a lot of post-war semis and estate houses with long gardens and side access, which makes rear extensions quicker to build.

How a wraparound extension in Castle Vale comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Castle Vale

Close by, we work in Washwood Heath, about 1.8 miles away, and Sutton Coldfield, about 3.4 miles away.

Other work in Castle Vale:

All rear extensions in Castle Vale

FAQ

Wraparound extension questions in Castle Vale

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Castle Vale?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

What postcode areas do you cover around Castle Vale?

Including B24, B34 and B35, and the surrounding West Midlands area.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price