Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Sunderland, Tyne and Wear

Wraparound extension in Sunderland

We plan and build wraparound extensions for homeowners in Sunderland. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

Sunderland and its postcode districts SR2, SR3, SR4 and SR5 are part of our Tyne and Wear coverage. Wraparound projects around Sunderland often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Sunderland?

Guide prices for a wraparound extension in Sunderland start from our North East England rate of £1,980–£3,240 per square metre, including VAT. North East prices are among the lowest in our range; former mining ground is the main foundation variable.

Wraparound extension prices in Sunderland
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£43,500–£71,500
L-shaped, about 30 m² of new floor£59,500–£97,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Sunderland?

The planning route for a wraparound extension in Sunderland is set by England's householder rules and your council.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Sunderland like to extend?

Brick terraces, colliery houses and post-war semis make up much of Sunderland. Former mining areas often need a coal mining risk check before foundations are designed.

How a wraparound extension in Sunderland comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Sunderland

From Sunderland, the nearest places we also cover are Ryhope (2.3 miles) and The Boldons (3.9 miles).

Other work in Sunderland:

All rear extensions in Sunderland

FAQ

Wraparound extension questions in Sunderland

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need planning permission for a rear extension in Sunderland?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

How long does a rear extension take to build in Sunderland?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Sunderland?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price