Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Stanwell, Surrey

Wraparound extension in Stanwell

Thinking about a wraparound extension in Stanwell? An L-shaped extension that fills the side return and runs across the back. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Stanwell sits in Surrey, with postcode districts including TW15, TW18 and TW19. In Stanwell we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Stanwell?

A wraparound extension in Stanwell is priced at £2,460–£4,030 per square metre including VAT as a guide, before kitchen fit-out and fees. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Wraparound extension prices in Stanwell
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£54,000–£88,500
L-shaped, about 30 m² of new floor£74,000–£121,000

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Stanwell?

Planning for a wraparound extension in Stanwell follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Stanwell like to extend?

Stanwell has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a wraparound extension in Stanwell comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Stanwell

Neighbouring places we cover include Ashford (1.8 miles) and Staines (2.0 miles).

Other work in Stanwell:

All rear extensions in Stanwell

FAQ

Wraparound extension questions in Stanwell

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

Do I need planning permission for a rear extension in Stanwell?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Can the corner be all glass?

Yes, with a steel or aluminium post or a structural glass corner. It needs careful thermal detailing to meet Building Regulations.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

How long does a rear extension take to build in Stanwell?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Do you handle building control in Stanwell?

Yes. We apply to the council or a registered building control approver and hand over the completion certificate.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price