Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Cranleigh, Surrey

Wraparound extension in Cranleigh

We plan and build wraparound extensions for homeowners in Cranleigh. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.

Cranleigh sits in Surrey, with postcode districts including GU6. In Cranleigh we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Cranleigh?

For Cranleigh we work from the South East England rate: £2,460–£4,030 per square metre of new floor, including VAT, standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Wraparound extension prices in Cranleigh
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£54,000–£88,500
L-shaped, about 30 m² of new floor£74,000–£121,000

Your written price follows a measured survey and an agreed design, so it reflects your house, not an average.

Do you need planning permission for a wraparound extension in Cranleigh?

Here is how the rules in England apply to a wraparound extension in Cranleigh.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Cranleigh like to extend?

Cranleigh has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.

How a wraparound extension in Cranleigh comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Cranleigh

We also build wraparound extensions in nearby Godalming (6.4 miles) and Guildford (7.5 miles).

Other work in Cranleigh:

All rear extensions in Cranleigh

FAQ

Wraparound extension questions in Cranleigh

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How much does a wraparound extension cost in Cranleigh?

As a guide, £2,460–£4,030 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £54,000–£88,500 at that rate. Your written price follows the survey.

Will it take a lot of garden?

Less than a deep rear extension of the same area, because part of the space comes from the side passage.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

How long does a rear extension take to build in Cranleigh?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price