Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Sudbury, Suffolk

Wraparound extension in Sudbury

Thinking about a wraparound extension in Sudbury? An L-shaped extension that fills the side return and runs across the back. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.

Sudbury sits in Suffolk, with postcode districts including CO10. In Sudbury we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Sudbury?

Guide prices for a wraparound extension in Sudbury start from our East of England rate of £2,330–£3,820 per square metre, including VAT. East of England prices run slightly above our West Midlands baseline; clay soils near trees are the main foundation variable.

Wraparound extension prices in Sudbury
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£51,500–£84,000
L-shaped, about 30 m² of new floor£70,000–£114,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Sudbury?

Planning for a wraparound extension in Sudbury follows the English householder rules.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Sudbury like to extend?

Post-war semis and newer estates are typical of Sudbury, and many have room for a full-width extension. Shrinkable clay is common in the East of England, so foundations near trees and hedges are designed to NHBC-style depth guidance.

How a wraparound extension in Sudbury comes together

  1. Survey visit

    We visit free of charge, measure up, check access, drainage and neighbours' extensions, and note what you want the room to do.

  2. Options and costs

    We draw layout options and price each one, so the budget shapes the design rather than surprising you later.

  3. Paperwork handled

    Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Sudbury

Close by, we work in Halstead, about 7.6 miles away, and Colchester, about 12.7 miles away.

Other work in Sudbury:

All rear extensions in Sudbury

FAQ

Wraparound extension questions in Sudbury

How long does a rear extension take to build in Sudbury?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

How much does a wraparound extension cost in Sudbury?

As a guide, £2,330–£3,820 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £51,500–£84,000 at that rate. Your written price follows the survey.

Do I need planning permission for a rear extension in Sudbury?

Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price