Wraparound extension in Preston

An L-shaped extension that fills the side return and runs across the back. We design, get the approvals for and build wraparound extensions in Preston and the surrounding area, with one contract from the first survey to building control sign-off.

Preston is covered from our Lancashire round, including PR1 and PR2. Wraparound projects around Preston often involve two neighbours, so we start the party wall conversations early.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Preston?

A wraparound extension in Preston is priced at £2,070–£3,380 per square metre including VAT as a guide, before kitchen fit-out and fees. North West prices sit below our West Midlands baseline; access on terraced streets is the main variable.

Wraparound extension prices in Preston
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£45,500–£74,500
L-shaped, about 30 m² of new floor£62,000–£101,500

We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.

Do you need planning permission for a wraparound extension in Preston?

Here is how the rules in England apply to a wraparound extension in Preston.

Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.

The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.

What are homes in Preston like to extend?

Preston has long runs of terraced houses with back yards and alleys, plus 1930s semis further out. Yard extensions on terraces are often single-storey and close to both boundaries.

How a wraparound extension in Preston comes together

  1. Look round and measure

    A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.

  2. Drawings and budget

    Floor plans and elevations for the options, each with a guide price.

  3. Approvals

    Permitted development check, prior approval or planning application, then Building Regulations drawings and structural calculations, plus party wall notices where they apply.

  4. Build and sign-off

    We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.

Wraparound extensions near Preston

Close by, we work in Leyland, about 4.5 miles away, and Clayton-le-Woods, about 4.8 miles away.

Other work in Preston:

All rear extensions in Preston

FAQ

Wraparound extension questions in Preston

Who will build my extension?

Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.

Can I live at home while the extension is built?

Usually yes. Most of the work is outside until the back wall is opened near the end, and that stage is screened off.

What roof suits a wraparound?

A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.

How long does a rear extension take to build in Preston?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Can I get a price without a visit?

Our online guide-price tool gives a range in a couple of minutes. A written price needs a survey.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price