Rear extension design, approvals and build across the UKCall 0800 088 6341 · Online guide price
Rear Extensionsrear-extensions.co.uk 0800 088 6341 Get a guide price

Rochester, Kent

Wraparound extension in Rochester

For homes in Rochester, a wraparound extension is often the simplest way to gain space without moving. An L-shaped extension that fills the side return and runs across the back. We take it from survey to completion certificate.

We cover Rochester (ME1, ME4 and ME5) as part of our Kent work. Wraparounds are the natural next step for the end-of-terrace and Victorian houses in Kent where a side return alone would leave the room too narrow.

Book a free site visit

Tell us about the house and we'll call to arrange a free, no-obligation visit.

How much does a wraparound extension cost in Rochester?

Guide prices for a wraparound extension in Rochester start from our South East England rate of £2,460–£4,030 per square metre, including VAT. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.

Wraparound extension prices in Rochester
SizeGuide price inc VAT
L-shaped, about 22 m² of new floor£54,000–£88,500
L-shaped, about 30 m² of new floor£74,000–£121,000

These are guide ranges; the written quote after the survey is the figure that counts.

Do you need planning permission for a wraparound extension in Rochester?

Planning for a wraparound extension in Rochester follows the English householder rules.

In England the side part of a side return or wraparound must meet the side-extension rules (one storey, under 4 metres high, no more than half the width of the original house), and those rights do not apply on designated land. Because a wraparound combines a side and a rear extension, many need householder planning permission.

Because rear extensions often sit on or near the boundary, the Party Wall etc. Act 1996 usually applies in England. Notices go out one or two months before work depending on the type of work, and a surveyor's award is only needed if a neighbour does not consent.

Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. We check your house's planning history and any conservation area before drawing, so the route is clear before you spend on plans.

What are homes in Rochester like to extend?

Around Rochester the housing ranges from inter-war semis to 1960s and 1970s estates with good-sized gardens. Many of the newer estates had permitted development rights removed by condition, so we check the planning history before anything is drawn.

How a wraparound extension in Rochester comes together

  1. Free site visit

    We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.

  2. Design and guide price

    Two or three layout options with a guide price for each, so you choose the design knowing what it costs.

  3. Planning and regulations

    We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.

  4. Written price, then build

    Once the design and approvals are in place, you get a fixed written price and programme, and we build through to sign-off.

Wraparound extensions near Rochester

We also build wraparound extensions in nearby Chatham (1.1 miles) and Strood (1.3 miles).

Other work in Rochester:

All rear extensions in Rochester

FAQ

Wraparound extension questions in Rochester

How much does a wraparound extension cost in Rochester?

As a guide, £2,460–£4,030 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £54,000–£88,500 at that rate. Your written price follows the survey.

Will I need a structural engineer?

Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.

Does a wraparound need planning permission?

Often yes, because the side and rear parts are judged together. Some fit within permitted development; we check before drawing.

Do I need a party wall agreement?

In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.

Can you match the brick or stone on my Rochester house?

We source the closest match and show you samples before ordering; reclaimed materials are often the best match on older houses.

How long does a rear extension take to build in Rochester?

Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.

Next step

See what your rear extension would cost

Get a guide price online in a couple of minutes, or book a free site visit and we'll measure up and talk you through the planning route.

CallGuide price