Winchester, Hampshire
Wraparound extension in Winchester
Thinking about a wraparound extension in Winchester? An L-shaped extension that fills the side return and runs across the back. Our team handles the drawings, the planning route and the build, and your contract is with one company throughout.
Winchester is covered from our Hampshire round, including SO21, SO22 and SO23. Wraparound projects around Winchester often involve two neighbours, so we start the party wall conversations early.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a wraparound extension cost in Winchester?
In Winchester, our guide for a wraparound extension is £2,460–£4,030 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £54,000–£88,500 |
| L-shaped, about 30 m² of new floor | £74,000–£121,000 |
Ground conditions, glazing, the roof and how far the house is opened up move the final figure within the range.
Do you need planning permission for a wraparound extension in Winchester?
Planning for a wraparound extension in Winchester follows the English householder rules.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. At the first visit we measure what is there now and tell you which route fits: permitted development, prior approval or a planning application.
What are homes in Winchester like to extend?
Commuter semis and detached houses make up much of Winchester, and longer gardens make England's prior approval route for deeper rear extensions worth considering.
How a wraparound extension in Winchester comes together
Free site visit
We measure the house and garden, look at the back wall, drainage and boundaries, and talk through what you want from the space.
Drawings and budget
Floor plans and elevations for the options, each with a guide price.
Paperwork handled
Planning, prior approval or permitted development, Building Regulations approval, structural design and party wall notices are all handled by us.
Fixed price and build
A written price for the agreed design, a start date and a named contact through the build, ending with the building control completion certificate.
Wraparound extensions near Winchester
Close by, we work in Bishopstoke, about 6.8 miles away, and Eastleigh, about 6.9 miles away.
- Wraparound extension in Bishopstoke
- Wraparound extension in Eastleigh
- Wraparound extension in Fair Oak
- Wraparound extension in Romsey
- Wraparound extension in Portswood
Other work in Winchester:
FAQ
Wraparound extension questions in Winchester
How much does a wraparound extension cost in Winchester?
As a guide, £2,460–£4,030 per square metre including VAT for a standard specification. For example, L-shaped, about 22 m² of new floor: about £54,000–£88,500 at that rate. Your written price follows the survey.
Do I need planning permission for a rear extension in Winchester?
Often not for a single-storey rear extension of up to 3 metres (4 metres on a detached house) under permitted development, or up to 6 or 8 metres with prior approval, unless the house is in a conservation area or its rights have been removed.
What roof suits a wraparound?
A flat roof with a lantern, a standing-seam pitched roof or a glazed roof over the side leg. The choice usually follows the first-floor windows above.
How long does a rear extension take to build in Winchester?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.
Who will build my extension?
Vetted building teams working under contract to us. Your contract is with S&K Property Investments and Improvement Ltd for the design and the build.