New Milton, Hampshire
Wraparound extension in New Milton
We plan and build wraparound extensions for homeowners in New Milton. An L-shaped extension that fills the side return and runs across the back. Start with a free site visit, then a written price once the design is agreed.
We cover New Milton (BH25) as part of our Hampshire work. In New Milton we usually draw the wraparound and a simpler rear-only option side by side, so the planning risk and cost difference are clear.
Book a free site visit
Tell us about the house and we'll call to arrange a free, no-obligation visit.
How much does a wraparound extension cost in New Milton?
In New Milton, our guide for a wraparound extension is £2,460–£4,030 per square metre including VAT for a standard specification. South East prices run above our West Midlands baseline, mainly on labour rates and clay-soil foundations.
| Size | Guide price inc VAT |
|---|---|
| L-shaped, about 22 m² of new floor | £54,000–£88,500 |
| L-shaped, about 30 m² of new floor | £74,000–£121,000 |
We put a fixed price in writing once the design is agreed, and explain any provisional sums such as foundations.
Do you need planning permission for a wraparound extension in New Milton?
Planning for a wraparound extension in New Milton follows the English householder rules.
Side return infills and the side leg of a wraparound are treated as side extensions in England: single-storey, no more than 4 metres high and no wider than half the original house. They are not permitted development in conservation areas, National Parks or National Landscapes, and a joined wraparound often needs a planning application because the side and rear rules apply together.
The Party Wall etc. Act 1996 applies in England: you serve notice two months before work to a shared wall, and one month before digging foundations within 3 metres (or 6 metres for deeper foundations) of a neighbour's building. Neighbours can agree in writing; if they dissent, surveyors agree an award.
Conservation areas, National Parks, National Landscapes and the Broads restrict permitted development, and listed buildings always need listed building consent. Before any drawing we look up the property's history with the council, because earlier extensions and removed rights change the answer.
What are homes in New Milton like to extend?
New Milton has a mix of Victorian terraces near the centre and larger Edwardian and inter-war houses further out. Clay soils across much of the South East mean deeper foundations near trees, which we plan for at the survey.
How a wraparound extension in New Milton comes together
Look round and measure
A free visit to see the back of the house, measure it, check the drains and boundaries and hear what you need.
Options and costs
We draw layout options and price each one, so the budget shapes the design rather than surprising you later.
Planning and regulations
We take the design through the right planning route, then produce the construction drawings and engineer's calculations for building control.
Build and sign-off
We build to the approved drawings with regular updates, then hand over the building control completion certificate and any guarantees from suppliers.
Wraparound extensions near New Milton
From New Milton, the nearest places we also cover are Christchurch (5.2 miles) and Lymington (5.6 miles).
- Wraparound extension in Christchurch
- Wraparound extension in Lymington
- Wraparound extension in Ringwood
- Wraparound extension in Bournemouth
- Wraparound extension in Ferndown
Other work in New Milton:
FAQ
Wraparound extension questions in New Milton
What postcode areas do you cover around New Milton?
Including BH25, and the surrounding Hampshire area.
Is the site visit in New Milton free?
Yes. We visit, measure up and talk through the options with no cost and no obligation.
Is it worth it over a side return alone?
If you want a dining table and a sofa as well as the kitchen, usually yes.
How long does a rear extension take to build in New Milton?
Most single-storey rear extensions take 10 to 16 weeks on site and two-storey extensions 16 to 26 weeks, after design and approvals.
Will I need a structural engineer?
Yes for the beam over the new opening and usually the foundations; we arrange them and their calculations go to building control.
Do I need a party wall agreement?
In England, usually yes if the extension is on or near a shared boundary or the foundations are close to a neighbour's building. We serve the notices.